115 results found
-
Asset level permission settings
It would be great if we could have different privacy or permission options for content on tasks. I can see this helping in a number of different scenarios. For example, there are times where we want to use CMP for internal reviews or sharing but don't want the entire project team to be able to access content and often times end up hopping in and out of other tools and programs to achieve this.
1 vote -
Multi select for asset expriation
It would be amazing if there were an option to multi-select from a task's content section for updating things like asset expiration dates, instead of having to select each item 1 by 1.
1 vote -
Attachments not taken from Work Request into Task
When creating a TASK from a WRQ which has Attachments, these are NOT pulled over to the Task´s Attachments which seems counterintuitive as the Creative Assets are pulled over from WRQ (Creative Assets) into the Task´s Content tab. This means extra manual work for users who are annoyed why this is not working if it works for Creative Assets field (but not all files for a WRQ are necessarily creative assets). Would be great to see it harmonised. Thanks so much
1 vote -
DAM Filtering - Limit Results to a specific Folder
At this time, the filters search all assets, regardless of the folder they are in. Ciena would like the ability to filter within a specific folder
1 vote -
Filter by Workflow AND Workflow Step in Plan
Ciena needs the ability to filter into specific Workflow Steps in the Plan view.
1 vote -
My Work View - Add Step End/Due Date
Can a due date please be added for the step that is assigned? Right now only the task due date is visible.
2 votes -
Password or permissions on public links
Toggle on/off for password protection or permissions on Collection public links to prevent the links being forwarded continually outside of intended recipients.
3 votes -
Replies and tagging
When it comes to replies, we always have to tag users even if you are replying to a comment from that person. If you reply to someones comment and you dont tag them, they don't even get notified, which is odd as you're replying directly to their comment.
It would be great if this could be updated so that it recognizes the people that were previously tagged, or who you are replying to. It's a bit tedious to always have to tag the same group of people.
We do love the feature to reply to comments from your outlook inbox,…
1 vote -
CMP Admin center architecture for admins
As a CMP Admin, the interface of admin center is complex. It will be helpful if the roles and teams are bifurcated differently and not as one under the role module. The nomenclature is confusing, and all items are housed under one section. For example group access - the instances for sandbox and production should be put in such a way so that it is easier to locate information, rather then getting lost with too much clutter.
1 vote -
Download all selection within Request Form board or comments
It would be really convenient if there were an option to multi-select or download all attachments from within the comments of a request - as opposed to opening each individual preview and downloading 1 by 1.
1 vote -
Create a Step option same as Field Name changes where you get the option to make the change to New & Existing templates
Marketing Manager who often gets asked to add new steps to multiple tasks - would be helpful if adding the step to the template and it updated new and existing tasks using that template
1 vote -
Efficiency Dashboards - Show SLAs
I love the Efficiency Dashboards feature and have heard from a lot of clients that they appreciate the ability to see how long it took to complete a task or the lead time for steps. However, what would take this one step further is if we show the lead time for a step vs. how long that step was supposed to take or the completion time for a task vs. how long that task was mean to take. It will help put the data in context for a lot of customers.
1 vote -
Enable Multi Region Support for Business Calendar
Most clients are global companies, and need to have regional support for holidays and working days (e.g. Friday/Sat vs Sat/Sun)
2 votes -
Plan view concern || Group title is hidden or pushed at bottom when you expand the list of tasks
In a recent UI upgrade or change in Optimizely we have noticed that the grouping title is now being moved to bottom of the list when you expand the group :
See below example: On a collapsed view all looks good, when I expand the group "None" as given in below example, all the tasks are listed on top and the group name is pushed to bottom.
The tasks list is too long so when scroll down the value of group title is not visible and it confuses what list we are looking at.
Previously the group name used to…
1 vote -
Group mailbox notification settings
We use team mailboxes (eg social media, web team, event team...) as users in CMP so we can assign Tasks or Requests to these shared mailboxes. These then receive the email notifications from CMP and it´s easier for our teams to stay on top of tons of the notifications in one inbox accessed by the whole team, than notifications sent to each member of a Team in CMP - so e.g. 10 people receive the same notification and when someone reads the email, the others might not be aware it has been already responded.
This works well for us, but…
1 vote -
Request to Add Organization-Level Option to Disable CMP Validation Popup
A new feature was added to the CMP that displays a validation popup whenever fields and their values are added, updated, or removed while working on a task. We would like to have the ability to disable this feature at the organization level within our instance.
1 vote -
Make it possible to save different pieces of content in the same task to unique DAM locations.
We often add design elements to a task that will result in a new piece of content being created. The design elements should be located in a separate folder in the DAM from the finished asset. For example, two headshots will be added to a final graphic. The headshots have a unique location in the DAM, and the final graphic has a unique location. Right now, it is a one size fits all strategy. Within a task, all content is saved to the same folder in the DAM. Can it be made possible to save content in the same task…
4 votes -
Disable expiry date notifications for archived assets
Whether at the organisation level or the asset level, there should be a way to disable notifications for asset expiry dates when the asset has been expired.
2 votes -
When copying tasks dates should also carry over
It would be nice if when copying tasks, the dates within the workflow carried over. There are times where we have repeatable items due within a given timeframe (Opticon for example) and it would save a lot of time adjusting timelines.
1 vote -
Change of workflow/step/task date - reason
I want users who make a change to a due date which impacts other task timelines to be asked to enter a reason for the change. This reason for the change should be something we should be able to report on it, so we can track changes in reasons for things being delayed or brought forward.
1 vote
- Don't see your idea?