Skip to Main Content
Customer Feedback

We love feedback from you on our products and the problems in your daily work that you would like us to solve. Please describe the challenge you're encountering and your desired outcome. Be as detailed as possible.

For technical issues or bugs please head to Support or our Developer Community. You can assign up to 20 votes in total. Thank you for your feedback.

Status explanation: 'Future Consideration' = Continuing to collect further feedback, not planned at this time. 'Investigating' = Prioritized for deeper customer and feasibility investigations ahead of planning development.

ADD FEEDBACK

All feedback

Showing 566

Allow multiple currency support

It would be a nice add to be able to use 1 revenue event for all currencies. Currently, we need to create 1 event per currency if we want to track revenue accurately. Instead, it would be nice to use 1 revenue event, and specify the currency insid...
almost 2 years ago in Experimentation Analytics / Metrics Setup 0 Future consideration

Enable "Session Count" feature in ODP

The session count feature was removed from ODP due to data issues. This request is to re-enable it.
2 months ago in Data Platform App 0 Future consideration

Hootsuite Integration Improvements

Ability to preview Tagging with labels Uploading a thumbnail image Setting up UTM parameters Scheduling Ability to integrate Hootsuite calendar with Welcome calendar
almost 3 years ago in Content Marketing / Integrations 0 Future consideration

Database Audit Logs for Compliance

Could you please consider to add a new section with in the PaaS Portal (preferably under the "Troubleshoot" section) that can be used to view the DB access logs, that contains details such as, Who access the DB and when ? and What actions are carr...
about 4 years ago in DXP Cloud Platform / Data management 4 Future consideration

Add External URL as Asset to DAM

We'd like to be able to take the external URL content that we work on in Tasks and add it to the library to then be used in our sales portals. For example, sometimes I want to include a website that we have a partnership with but don't build ourse...
about 2 years ago in Content Marketing / DAM/Library 0 Future consideration

Replace User with New User

A member of our team has left the business. It would be good if we could replace that User profile in the CMP with a new user who is replacing that role, rather than manually changing every step in all the workflows that relate to that User.
over 1 year ago in Content Marketing / Settings + Configuration 0 Future consideration

Include "Canceled" as a progress level for a task

We have some tasks that are started but then not needed anymore and we'd like to keep a record of those tasks. We'd like a "Canceled" designation for a Task. Right now we only have "In Progress" or "Complete"
over 1 year ago in Content Marketing / Tasks, Campaigns, and Events 0 Future consideration

Bulk Download Assets from DAM

Currently the maximum amount of assets you can download at once from the DAM is 100. We have an instance where we need to download 1800 assets and would like a way to bulk download all assets that are in a folder or relate to a specific filter.
10 months ago in Content Marketing 3 Future consideration

One-click cleanup for obsolete Audiences/Events/Experiments

The GUI tends to get cluttered (at the same time blowing up the datafile). It would be great to have an option to automatically archive elements that are beyond a certain threshhold - such as experiments that are stopped for +6 months, Audiences/a...
about 1 year ago in Feature Experimentation / Project / Account Configuration / Settings 2 Future consideration

Add to Library Before Task is Complete

We often have "post-production" steps that we want to include on our workflow AFTER the created asset is going to be made available to end-users via the Library. These are steps like social promotion, checking on analytics, etc.
over 1 year ago in Content Marketing / DAM/Library / Tasks, Campaigns, and Events 0 Future consideration